The refurbishment

A renovation in phases

During the renovation of Atlas, materials have been reused as much as possible. The impact of the building on the environment was minimized, a consideration that was also influential in the choice of materials. In addition, during the building process measures have been taken to limit the impact of the building work on the environment as much as possible.

Dusseldorp has done the asbestos removal and demolition work. Subcontractor Van Wijnen has done the renovation. 16 November, 2018, Atlas was ready.